Figure 2, 3 and 4

Figure 2, 3 and 4

Figure 2. Drill layout for the 2024 Phase 1 and historical drilling at Mermaid; Figure 3. Pierce point long section of the 2024 RC results at the Mermaid deposit; Figure 4. Section B-B': multiple significant intersections where intercepted during drilling testing for lateral extension of the Mermaid deposit

Format

JPEG

Source

Central Iron Ore Limited

Downloads